330 kV Longquan substation project 2016-05-18

Project Name: 330 kV Longquan substation project
Product type: 330kV Copper Cable 1x1200mm2 35.42KMDate: 2008-2011
Project profile: The total investment of Longquan 330kV subsation proejct is 198.47 million yuan,
The investment of transmission line project is 18.38 million yuan, the investment of optical fiber communication project is 3.04 million yuan.The project mianly solve the electricity demand of key projects in Yuheng industrial park, meantime expanding the national grid 330 kV and 110 kV main grid distribution network coverage.The substation installs two main transformer, the capacity is 2x24 million KVA. 2 back 330 kV outlet and 6 back 110 volt outlet.Longquan - Yulin π Connected Line (North π), the length is 9.4kilometers. Longquan - Yu Wang double-circuit line, the length is 2x28 kilometers,Substation project started in July 2008, Line Project started in March 2009, all construction and lack of consumer self-test was finished in the first half year 2010. It was put into operation in the end of October 2011.
Solutions
We won the tender to provide 35.42KM 330kV 1x1200mm2 cable.We provided good quality cable according to contract requirements and got the user’s inspection acceptance.